From an Incomplete Quote to a Finished AV Installation at Torrey Hills Periodontal Group

Torrey Hills Periodontal Group wanted to add four TVs to its treatment rooms, each connected to an existing computer as a second display. But after receiving an initial quote, the practice was still left with questions about the equipment needed and how the installation would actually come together.

What seemed like a straightforward TV installation required more planning than simply mounting screens on the ceiling.


A Quote That Didn’t Cover the Whole Project

The practice had already taken steps toward getting the TVs installed. However, the original quote was basic and didn’t account for all the parts needed to complete the job. There were still practical questions to work through. How would the TVs be mounted to the ceiling? What hardware would be needed? How would the displays connect to the computers already in the treatment rooms?


For Torrey Hills Periodontal Group, the challenge wasn’t deciding whether to install the TVs. It was finding someone who could work through those details and carry out the complete installation.


Working Through the Installation Requirements

Ameritechs approached the project by looking at what each treatment room needed, from the ceiling mounting locations to the computer connections.


Before installation began, the team verified the ceiling beam locations and determined where the TVs and mounting hardware would go. Ameritechs also coordinated with the electrician to determine the best locations for power, making sure the electrical work aligned with the planned TV placements.


With work taking place inside an existing dental practice, the technicians took precautions to protect the treatment spaces. 


Ameritechs installed four beam attachments and support poles to securely mount the TVs at their designated locations. But mounting the screens was only one part of the job. Each TV also needed a connection to its corresponding computer, which meant planning cable routes through the existing ceiling and down to the computer positions.


Paying Attention to the Details Patients Notice

One of the smaller details of the installation was also one of the most visible.


Where each TV’s mounting pole passed through the drop ceiling, the electrician added finishing touches to the cover surrounding the pole, giving the installation a cleaner, more finished appearance. It’s a detail that might seem minor from an installation standpoint. But in a treatment room, patients spend time looking upward, making the ceiling-mounted equipment part of what they see.


Taking care of those finishing details helped the new displays fit more neatly into the treatment rooms, rather than looking like the equipment that had simply been added afterward.


Connecting the Displays to the Existing Computers

Rather than leaving visible cables running between the TVs and computers, Ameritechs routed four HDMI connections above the ceiling and down to the corresponding computer locations.


Once the cables were in place, the technicians connected each TV to its computer and configured it to function as an extended second display. This was an important part of completing the project. The practice wasn’t simply receiving four mounted TVs, each screen needed to work with the computer already assigned to that treatment room.


The team labeled the connections, tested all four setups, documented the installations, and cleaned up the work areas before finishing.


From an Incomplete Quote to Four Working Displays

By the end of the project, Torrey Hills Periodontal Group had four ceiling-mounted TVs connected to their respective computers and configured as extended displays. The mounting hardware, cable routing, computer connections, and final testing were all handled as part of the same installation. What had started with an incomplete quote and uncertainty about how to proceed became a finished system, without the practice having to work out the remaining technical details on its own.